Solvent-Based PolyurethaneInjection Grout

Water-Based Polyurethane Waterproof Coating

555

Single-component / Eco friendly / OEM Accepted

5
稿定设计 25 拷贝
稿定设计 23 拷贝
稿定设计 14 拷贝

1.Building & Underground Projects

2Geological Drilling Projects:Sealing leaks in cracks, expansion joints, construction joints and structural joints of various buildings and underground concrete projects.

3.Water Conservancy & Hydropower
Dam grouting, tunnel crack sealing, anti-seepage and reinforcement of concrete cracks in dam structures.

4.Transportation Infrastructure
Stabilization and reinforcement of high-rise buildings, railway foundations, and high-grade highway roadbeds; reinforcement of bridge foundations and crack repair in bridge structures.

Specification:7kg / pail, 10kg/pail, 20kg/pail
Appearance:Single component, brown liquid.
Foaming ratioMax. 30 times
Shelf Life:1 Year
ItemData
AppearanceUniform liquid, no impurities, no
separation.
Density, g/cm³≥ 1.05
Viscosity, mPa·s
≤ 1.0×103
Non-volatile content, %
≥ 78
Foaming rate, %≥ 1000
Water impermeability 0.3MPa, 0.5hImpervious
Compressive strength,
MPa
≥ 6

ADVANTAGES

Rapid Reaction:

Reacts quickly with water, expanding
and solidifying.

High expansion rate

This product features a high expansion rate and is non-shrinking, capable of forming
solid foam material up to 30 times its original volume,

Strong Adhesion:

Provides strong adhesion to
substrates and excellent chemical resistance

Strong permeability:

Low viscosity, large penetration
radius, capable of penetrating fine cracks and pores, with
strong adhesion to the substrate, ensuring long-lasting
repair effects.

Note:

1..To ensure sufficient time for smooth operation, this product expands to its maximum state in about 20 minutes at room temperature. If faster speed is required, an accelerator can be added, which can be purchasedseparately from the manufacturer

2.The ambient temperature during application should beabove 0°C, as low temperatures may affect the reactionand curing speed.

3.Ensure adequate ventilation and keep away from anyignition sources during application. Open flames must not be used in the surrounding work area before the materialhas cured

4.Immediately after use, machine must be thoroughly cleaned with a cleaning agent until completely clean.

Construction Process

hydrophobic polyurethane foam grout Application

图片1 拷贝

Pre-construction Preparation

Surface Preparation: Clear oil, moss, loose concrete and debris. Chisel or brush crack areas for firm base.

图片2 拷贝

Drilling and Hole Cleaning

Hole Layout & Positioning: Pinpoint leakages including cracks, joints and voids. Stagger injection holes 3-5cm from crack sides.

图片3 拷贝

Packer Installation

Insert packers into holes and fasten firmly with wrench till rubber rings seal tightly.
Optional: Coat cracks with quick-set mortar to avoid slurry leakage during grouting

图片4 拷贝

Grouting Operation

Lead ofEquipment Inspection: Verify grouting machine, gauge and hoses intact, connect power safely.
Grout Feeding: Fill polyurethane grout into machine hopper. Operation

图片5 拷贝

Packer Removal

Packer Removal: After 24 hours (or upon confirmation that the grout has fully cured), unscrew or knock off the packers using a wrench.

图片7 拷贝

Hole Sealing

Fill and level the injection holes with cement-based plugging material, epoxy mortar, or waterproof mortar to ensure a smooth and even substrate surface.

First Name
Last Name
Email
Message
The form has been submitted successfully!
There has been some error while submitting the form. Please verify all form fields again.

Contact us

Address

Building 12, Yun Chao Fu, Hangzhou City, Zhejiang Province, china.

Phone

+86 15231151892
+86 15906641341

EMAIL

info@boslaiwaterproof.com